Friday, September 24, 2010

"Completed" Level amendments

As discussed over Skype, I've changed the problems raised with the Completed level. A few of these may have to be corrected in the other stages also, depending on the layout so I'm linking the corrected version.

Changes were:

> Toilet stall dimensions (width, depth)
FIXED
> Toilet entrance visibility
FIXED: Small entrance added, doors moved apart slightly
> Protruding Geometry in Conference rooms on 1B
FIXED: Removed
> Changes to Walkway (being parallel, obscuring Plant wall)
FIXED: Walkway nearest elevator now meets up parallel with others, Walkway infront of Plant wall removed.
> Cubicle dimensions (height, depth)
FIXED
> Elevator shaft dimensions
FIXED
> Door sizes
FIXED: All doors but those leading to the Toilet and Elevators made smaller

Link : http://www.filefront.com/17315585/DM-Completed.ut3