Monday, October 11, 2010

Dimention adjustments










1st image is the "Base line" from where the measurements were taken (north wall)!

1 - Meeting room on Level 2: Division added, extra door added - approx halfway (see image)
2 - Area/rooms near Kitchen/Cafeteria: Wall moved (measurements specified in 4 ), Second door now enters kitchen
3 - 1B - Left room: The "block-in" begins at ~2715 from base and fills the rest of the room behind it
4 - Kitchen area: Wall extended, now begins at ~2665, wall may have to be thickened using edge geometry
5 - 1B - Right room: The "block-in" begins at ~925 from base and fills the rest of the room behind it
6 - Cubicles: Wall blocked in ~270 from base
7 - Lobby: Back wall blocked in ~270 from base

No comments:

Post a Comment